When a permit is usually required
In most Miami-Dade jurisdictions, a bathroom remodel permit is triggered by any of the following: moving or adding a plumbing fixture (toilet, sink, tub, shower, bidet, or floor drain); replacing a tub with a shower or converting a shower to a tub, because the drain configuration changes; new or relocated waste and vent stacks; adding or relocating electrical outlets, lighting fixtures, or GFCI circuits; installing an exhaust fan where none existed; opening, removing, or moving a wall — even a non-load-bearing partition; adding or replacing windows in the bathroom; and any structural work related to a new bathroom addition or an expanded footprint.