Miami-Dade Permit Application Forms: What You Need Before You Submit

The Miami-Dade permit application is more than one form. Here is what a complete submittal package usually looks like, which forms different jurisdictions require, and how to avoid the intake rejects that add weeks to a permit.

July 9, 2026·8 min read·South Florida Permit Pros

Short answer

A Miami-Dade permit application is a package, not a single form. Depending on the jurisdiction and scope, expect a main application form, a notice of commencement, product approval documentation, contractor licensing paperwork, and — for many projects — a HOA or condo approval letter. Different Miami-Dade cities publish their own forms, and using the wrong version is a common cause of intake rejects.

One of the first questions on any new permit project is which application form to use. In Miami-Dade County, the answer depends on the jurisdiction. Unincorporated Miami-Dade uses the county's forms. Incorporated cities — Miami, Miami Beach, Coral Gables, Aventura, Doral, Pinecrest, Homestead, and dozens of others — each publish their own. Filing on the wrong form, or on an outdated version, causes an intake reject before the plan review even begins.

This guide covers what a complete Miami-Dade permit application package usually looks like, which forms different jurisdictions require, and how to prepare a submittal that clears intake on the first pass. It applies most directly to residential and small commercial projects; large developments have additional forms and processes.

The core permit application

The main permit application form asks for the property address and folio number, the property owner, the applicant, the contractor, the scope of work, and the estimated construction value. The form varies by jurisdiction but the content is consistent. Unincorporated Miami-Dade uses the Miami-Dade County Regulatory and Economic Resources (RER) application. Cities like Coral Gables and Miami Beach have their own versions published on their building department websites. The application is signed by the contractor and, in some cases, the property owner.

Notice of Commencement

For most permitted construction with a value above a jurisdiction's threshold (often $2,500 or $5,000), Florida law requires a Notice of Commencement recorded with the Miami-Dade Clerk of Court and posted at the construction site before the first inspection. It is a lien-law document, not a permit document, but the building department checks that it has been recorded. Missing or unrecorded NOCs are a common cause of failed initial inspections.

Product approvals

For any project that touches the building envelope — windows, doors, roofing, hurricane shutters, or exterior finishes — the submittal has to include current Miami-Dade Notice of Acceptance (NOA) or Florida Product Approval documentation for each specified product. This is a plan-review document. Reviewers verify that the NOA is current, that the size and configuration are covered, and that the design pressures match the site.

Contractor licensing and insurance

Every permit application in Miami-Dade requires the contractor's Florida Certified or Registered license number, workers' compensation certificate (or a valid exemption), and general liability insurance certificate. Some jurisdictions require a local business tax receipt (BTR) in addition. Owner-builder permits require additional acknowledgments and are limited to specific types of work on a primary residence.

Association approvals

Condominium and HOA-controlled properties add an association approval letter to the submittal. Most Miami-Dade jurisdictions require this before permit issuance for any work inside a condo unit or on an HOA-controlled property. Association approval is separate from the building permit and typically has its own review process, often faster than the building permit.

Signed and sealed drawings

Most permitted construction in Miami-Dade requires drawings signed and sealed by a Florida-licensed architect or engineer. The exception is small residential work under a jurisdiction's threshold, where owner-drawn plans may be acceptable. Structural, MEP, and complex projects always require professional seals.

Additional forms by jurisdiction

Some jurisdictions add specific forms. Miami-Dade DERM (Department of Environmental Resource Management) has environmental review forms for projects that affect trees, wells, canals, or drainage. Public Works forms are required for right-of-way work. Fire prevention forms apply to commercial projects and to residential projects with hood systems or gas storage. Coral Gables adds Board of Architects review forms for exterior residential work in the city. Miami Beach adds Historic Preservation Board forms for work in historic districts.

Common mistakes at intake

The most common intake reject is using an outdated form. Jurisdictions revise their applications, and old versions posted on third-party websites circulate for months. Always download the latest version from the specific jurisdiction's website on the day of filing. The second most common issue is missing signatures — the contractor signature, the property owner signature (where required), and the design professional's seal all have to be current and correctly placed.

A third common issue is contractor licensing gaps. A GC's license may be current, but a sub's license may have lapsed, or the workers' compensation certificate may have expired. Intake staff verify each of these before accepting the package.

Documents usually needed for intake

A typical Miami-Dade permit intake package includes: the correct jurisdiction's application form, completed and signed; contractor license, workers' compensation, and liability insurance certificates; the property boundary survey; a scope-appropriate drawing set signed and sealed as required; product approvals for envelope components; a notice of commencement recorded with the clerk (posted before first inspection); HOA or condo association approval; DERM, Public Works, or Fire forms where applicable; and the permit fee. Missing any of these can bounce the application at intake.

How South Florida Permit Pros can help

We prepare and file permit application packages across every Miami-Dade jurisdiction, from unincorporated county filings to complex Coral Gables, Miami Beach, and Aventura submittals. Our team pulls the current forms, prepares the coversheet package, verifies contractor and insurance documentation, records the notice of commencement, and files the permit — clean first pass, no intake rejects. For contractors and developers running multiple concurrent projects, a permit review at the start of each project catches the specific jurisdiction's quirks before they cost a week at intake.

FAQ

Frequently asked questions

  • Where do I find the Miami-Dade permit application form?

    Unincorporated Miami-Dade projects use the county's RER application, published on the Miami-Dade County website. Incorporated cities publish their own forms on each city's building department website. Always download the current version on the day of filing.

  • Do I need to apply in person?

    Many Miami-Dade jurisdictions now accept online submittals through ePlan systems. Some still require in-person intake for certain project types. The specific jurisdiction's website lists the accepted filing methods.

  • What is a Notice of Commencement?

    A Notice of Commencement is a lien-law document recorded with the Miami-Dade Clerk of Court that identifies the property, the owner, the contractor, and the scope of work. Florida law requires it for most permitted construction above a value threshold, and it must be posted on the job site before the first inspection.

  • Can a homeowner file the permit application?

    Florida allows owner-builder permits for a homeowner's primary residence in specific situations. Most Miami-Dade jurisdictions still require licensed trades for plumbing, electrical, gas, and roofing work. Owner-builder permits also carry liability considerations most homeowners underestimate.

  • What happens if the wrong form is submitted?

    The submittal is rejected at intake, before plan review begins. The applicant resubmits with the correct form. Since intake is not part of the reviewer's queue, this typically adds one to two weeks depending on the jurisdiction.

  • How long is a permit application good for?

    Most Miami-Dade jurisdictions expire an unissued permit application after six months of inactivity. Once issued, the permit itself has separate expiration rules based on inspection activity.

Need help on your project?

Get a written permit review for your address.

We audit scope, map the jurisdiction, and deliver a submission calendar.

Request Permit Review

Related resources

Let's discuss your next project

Send us the address.
We'll take it from there.

Office

Miami · Florida
Serving Miami-Dade & Broward

Response

Same-day intake
Weekdays 8–6